Getting a new Sui Gas connection (SNGPL or SSGC) in 2025 has become more detailed, mainly due to Pakistan’s shift towards using imported Regasified Liquefied Natural Gas (RLNG) for new domestic consumers. Whether you are a new homeowner or a tenant, understanding the online application process, required documents, and RLNG tariffs can feel overwhelming.
This guide explains everything you need to know to successfully apply for a New Sui Gas Connection, track your application, and manage costs effectively.
Understanding the RLNG Policy for New Connections
Due to local natural gas depletion, all new domestic connections are now connected to RLNG-based supply, especially where the pipeline network allows.
Why this matters for consumers:
- Reliable Supply: RLNG ensures consistent gas delivery, even during winter when local gas pressure drops.
- Higher Cost: RLNG tariffs are higher than local gas rates, so expect a slightly larger monthly bill.
Estimated Cost & Timeline for a New Connection
The cost and duration vary depending on your area and the pipeline network.
| Component | Cost | Estimated Time (after Demand Notice payment) |
|---|---|---|
| Application Fee | Nominal, non-refundable | Instant |
| Security Deposit | Based on estimated consumption | N/A |
| Service Line Charges | Depends on distance from main line | 3 – 6 Months |
| Installation | Included in Demand Notice | – |
Step-by-Step Online Application for a New Sui Gas Connection
The application is mostly online via SNGPL or SSGC official portals.
Documents Required
Before applying, prepare digital copies of:
- CNIC: Front and back.
- Property Proof: Sale deed, registry, or allotment letter. Tenants need a NOC from landlord.
- Address Proof: Electricity or water bill.
- Neighbouring Gas Bill: To verify gas line availability.
- Site Plan: Simple map showing your house/plot relative to street or landmarks.
Applying Online
- Visit the official SNGPL or SSGC portal and go to the “New Connection” section.
- Fill in your personal info, property address, and connection type (Domestic).
- Upload all required documents.
- Submit and receive an Application Reference Number—save it for tracking your connection status.

Tracking Your New Sui Gas Connection
Both SNGPL and SSGC allow online tracking using your Application Reference Number. Typical status updates include:
- Submitted: Application received.
- Feasibility Check: Engineers assess if connection is possible.
- Demand Notice Issued: Charges calculated and ready for payment.
- Approved/Installation Pending: Payment received, installation scheduled.
Demand Notice Payment: This covers security deposit and installation charges. Connection will proceed only after payment.
Official Online Application Links (SNGPL & SSGC)
To apply for a new Sui Gas connection, only these two official portals should be used:
SNGPL – Online Application Form (Punjab, KPK, Islamabad, AJK)
Apply here:
https://www.sngpl.com.pk/onlineapp/pages/index.jsp
SSGC – Online New Connection Portal (Sindh & Balochistan)
Apply here:
https://www.ssgc.com.pk/web/
FAQs About New Sui Gas Connection 2025
Q1: How long does it take to get a connection?
A: Usually 3–6 months after paying the Demand Notice, depending on distance from the main pipeline.
Q2: Will RLNG make my bill very expensive?
A: RLNG is costlier than local gas, but usage management can help keep bills reasonable.
Q3: What if my application is rejected?
A: Rejections usually happen due to wrong documents or non-feasibility. Correct documents or wait for pipeline development if non-feasible.
Q4: Can tenants get a connection without property ownership?
A: Yes, with a registered tenancy agreement and a NOC from the landlord.